
MALANG, EAST JAVA, INDONESIA, SEPTEMBER 29, 2026: Construction continues on the Karangkates Floating Solar Power Plant (PLTS) at Sutami Dam in Malang Regency, East Java. The floating solar facility is designed to have a peak generation capacity of up to 133 megawatts (MWp) and is scheduled to begin operations by the end of 2026. Photo by Hayu Yudha Prabowo / JNA Press. (Photo by Hayu Yudha Prabowo/JNA Press via Nexpher Images)
NX points
Better deals with NX points
Create an account to unlock license options and download with points — or compare packages for the best value.
2-week unlimited-use license · 1920px JPEG · Organic social posts only
For editorial use on a digital platform only, such as social media, website.
For print and digital use in a newspaper, magazine, textbook or museum display
For broadcast and television purposes, restricted to editorial program usage