Rasuwa, NEPAL, October 14, 2026: An aerial view shows a newly installed Bailey bridge connecting the border areas of Nuwakot and Rasuwa districts in Nepal. the bridge was installed to restore road connectivity after severe flooding destroyed existing bridges on August 26, 2026. (Photo by ap tolang/Nexpher Images)

New Suspension Bridge Restores Connectivity in Rasuwa

Rasuwa, NEPAL, October 14, 2026: An aerial view shows a newly installed Bailey bridge connecting the border areas of Nuwakot and Rasuwa districts in Nepal. the bridge was installed to restore road connectivity after severe flooding destroyed existing bridges on August 26, 2026. (Photo by ap tolang/Nexpher Images)

Credit: ap tolang / Contributor
Source: Nexpher Images News
Collection: Nexpher Images News
4000 x 3000, 7.36 MB
Published At: 19/10/2569 04:27:09
Created At: 14/10/2569 17:55:21
Editorial - RightsManaged
Image ID: 107076
Restrictions: This Image is restricted for Editorial Use Only, For Other Use Additional Clearance is Required, contact Nexpher Images for More.
Geo-restriction: Worldwide available

NX points

Better deals with NX points

Create an account to unlock license options and download with points — or compare packages for the best value.

Instant download
Works across licenses
Editorial + Social
Points never expire

Social

2-week unlimited-use license · 1920px JPEG · Organic social posts only

Buy 10+ and save at checkout

Digital

$30

For editorial use on a digital platform only, such as social media, website.

Editorial

$170

For print and digital use in a newspaper, magazine, textbook or museum display

TV / Broadcast

$350

For broadcast and television purposes, restricted to editorial program usage

Similar images